Generates electricity during daylight
Your home uses the electricity as it is generated. Surplus electricity can be exported to the grid or stored for later if a battery is included.
Solar panels can reduce how much electricity a home imports from the grid. Costs, grant eligibility and suitability vary by property, so understand the options before comparing suitable installers.
Upgrade My Home reviews your solar enquiry before sharing it with a small number of participating installers that may suit your location and requirements.
Solar photovoltaic panels generate electricity from daylight. An inverter converts it into electricity your home can use. What matters is how well the proposed system fits your roof, electricity use and budget.
Your home uses the electricity as it is generated. Surplus electricity can be exported to the grid or stored for later if a battery is included.
Roof space, shading, roof condition, orientation and household electricity use all affect whether solar is a sensible option.
Have recent electricity bills ready and ask for written proposals covering system output, equipment, warranties, paperwork and the full installed price.
There is no single reliable nationwide price for every home. Quotes vary because the equipment and installation work must suit the property.
Compare the complete proposal, not only the headline total. A lower quote may include a different system size, product specification, warranty or level of electrical work.
Read the solar panel costs guide →Use our homeowner guides to understand the options before requesting quotes.
For applications made under the 2026 domestic scheme, SEAI lists a maximum Solar PV grant of €1,800. The amount is calculated from the system's kWp capacity and is subject to the scheme rules in force when you apply.
€700 per kWp for the first 2kWp, then €200 for each additional kWp up to 4kWp, capped at €1,800.
Grant values and rules can change. Confirm the current position directly with SEAI before signing a contract or starting work.
Upgrade My Home does not administer, approve or guarantee SEAI grants. SEAI also states that registration does not mean it approves, guarantees or warranties a company or its work.
There is no universal answer. The result depends on what the system costs, how much electricity it produces and how much of that electricity your household can use or export.
Annual consumption matters, but timing matters too. Using more electricity during daylight can increase the proportion of solar generation used directly in the home.
Orientation, shading, system size, equipment, predicted annual output and battery choice can materially change the outcome.
Consider the net upfront cost, electricity prices, export payments, maintenance, warranties and how long you expect to own the property.
Ask each installer to explain the assumptions behind its output and savings estimate. Export rates are set by electricity suppliers and can change, so they should not be treated as guaranteed for the life of the system.
Read the solar panels worth-it guide →There is no single standard number of panels for every home. A sensible system size depends on roof space, orientation and shading, household electricity use, when that electricity is used and the level of generation the homeowner wants.
A proposal should explain the recommended panel count, system capacity and estimated annual generation, including the assumptions behind those figures.
Understand solar panel system sizing →A battery stores electricity that is not used when the panels generate it, so it can be used later. It may increase the share of solar electricity used in the home, but it also adds cost and loses some energy during charging and discharging.
A battery can be more relevant where evening demand is high, daytime use is low or the household wants to use time-of-use tariffs in a particular way. It is not automatically the best choice for every home.
Compare solar with and without a battery →A proper survey and system design are needed before deciding. These are the main practical checks to discuss with an installer.
If the property is protected, in an Architectural Conservation Area, or the proposal may fall outside the exemption conditions, check with the local planning authority before proceeding.
Read the government planning overview →The exact sequence depends on the system and whether you are applying for a grant. For a grant-supported home project, the main stages are:
Review bills, roof condition, shading, orientation, available space and any likely electrical work.
Get written proposals and compare their design assumptions, equipment, warranties, paperwork and full price.
If using the SEAI grant, choose an SEAI-registered Solar PV company, apply and wait for the Letter of Offer before work starts.
The company or installer submits the relevant connection application to ESB Networks before installation. Domestic microgeneration commonly uses the NC6 route when it is within the applicable limits.
The panels, mounting system, inverter and any battery are installed, tested and connected by the appropriate registered contractors.
For the grant, this includes the Declaration of Works, electrical certificates, NC6 documentation, invoice, photographs and a published post-works BER.
SEAI reviews the completion evidence before payment. Once ESB Networks has processed the connection details, eligible exported electricity is handled through the homeowner's electricity supplier.
A useful quote should make it possible to understand what is being installed, what the system is expected to produce and who is responsible for each part of the process.
Upgrade My Home is designed to help homeowners organise this comparison and decide which suitable businesses, if any, they want to hear from.
Compare Solar QuotesSubmit the practical details needed to understand your home and the work you are considering.
We review the project and may identify suitable participating installers for the location and type of work.
Where suitable options are available, we may share your enquiry and contact details with a small number of selected participating installers so they can contact you about it.
Use these guides to understand costs, grants, system sizing, batteries and installer quotes before deciding what suits your home.
See what shapes installed solar PV prices, how SEAI’s median data should be read, and what a complete quote should include.
Read the cost guide →Check the current SEAI grant amount, eligibility rules and the steps that must be completed in the right order.
Read the grant guide →Assess roof suitability, electricity use, likely self-consumption, export payments and how long you expect to stay.
Read the decision guide →Size a system around electricity use, usable roof area, shading and annual generation rather than panel count alone.
Read the sizing guide →Understand what a battery changes, when it may suit a household, and which costs and warranty details to compare.
Compare the options →Compare system design, products, warranties, grant responsibilities and written scope before choosing an installer.
Read the quote guide →SEAI lists a maximum domestic Solar PV grant of €1,800 for 2026. It is calculated at €700 per kWp for the first 2kWp and €200 per additional kWp up to 4kWp. Confirm the rate and rules with SEAI before starting work.
Most houses can install rooftop solar panels without planning permission, subject to exemption conditions. Protected structures, homes in Architectural Conservation Areas and proposals outside the standard conditions should be checked with the local planning authority.
No. A battery can store surplus generation for later use, but it adds cost and is not automatically suitable for every household. Compare the battery's usable capacity, warranty and expected use against a system without one.
The right number depends on electricity use, usable roof area, shading, panel rating, inverter design and budget. Compare proposed annual generation and layout rather than judging a system only by panel count.
Yes. Solar PV generates electricity from daylight and still works on overcast days, although output is lower than in direct sunlight and varies through the year.
The physical installation and the full project timeline vary. Roof access, electrical work, equipment availability, weather, grant approval and the grid-notification process can all affect the schedule. Ask for a written programme with the quote.
NC6 is the ESB Networks notification route used for microgeneration within its applicable limits. It provides the equipment and connection information needed before installation. Under the SEAI grant process, the Solar PV company is responsible for submitting it.
A post-works BER is required to draw down the SEAI Solar PV grant. It must be completed by a registered BER assessor and published on the National BER Register.
Grant schemes, planning rules and grid processes can change. Use these official sources to confirm the current requirements for your project.
Information checked against official sources on 22 August 2026.